Phase I of Sector La Hoya (€33M initial investment) has reached its first major milestone: Avenida José Carreras is open. The avenue — connecting CV-905 to Torrevieja’s sports area — has been transformed into a wide, tree-lined boulevard: two lanes in each direction, cycle lane, generous pavements and integrated SuDS drainage. It is now the eastern gateway to the sector, and when the future four-lane bridge replaces the current overpass on the Torrevieja Bypass, it will redefine how the western city moves.
SuDS are built into every element of the street design: draining concrete in the parking bays, gravel-filter areas in road islands, and geotextile filtration throughout.
Works continue towards Phase I completion in spring-summer 2025. At full build-out: more than 7,000 homes, civic facilities, and a significant green buffer adjoining the Lagunas de la Mata–Torrevieja Natural Park. A new model for sustainable urban growth.
La Hoya, Torrevieja: Avenida José Carreras Opens
RELATED NEWS
CIVIS at Connecting Europe Days 2026
CIVIS Consultores joined Espais Econòmics Empresarials at Connecting Europe Days 2026 in Brussels, helping showcase the Parc Sagunt II Intermodal Platform and its strategic role within the Mediterranean Corridor.