Skip links
Montaje vigas foto cenital

Sagunto Intermodal Platform

The works of phase 1 of Sagunto Intermodal Platform, in Parc Sagunt II Logistics Area, are ending the earthmoving works and drainage installations; manwhile, the building of the structures that will allow the passage of the railway and the road network at different levels, are nowadays at “full power”.

The underpass situated in the connection brunch with the national railway network, is at a high level of execution. CIVIS CONSULTORES participates in a joint venture with Ardanuy Ingeniería S.A. and TYPSA., as successful bidders for the "Technical services for the execution and development of Phase 1 of the Intermodal Platform in the Sagunto Logistics area", carrying out, among others, the tasks of Technical Management of the Works, Health and Safety Coordination, and technical assistance in the preparation of railway safety documents and subsequent management of the terminal.

Montaje vigas paso elevado
Cookie Policy
See your Privacy Settings to learn more.
Home