Skip links

On the Ground at Amurrio: Inspecting the First Rail Turnouts

On 6 February, the CIVIS–Ardanuy–TYPSA construction management team visited Amurrio Ferrocarril y Equipos to inspect the first rail turnouts ahead of their transport to the Sagunto Intermodal Platform site.

Beyond quality checks, the Amurrio Technical Director walked us through the entire manufacturing process — from design conception through casting, roughing and pre-assembly — giving us a full picture of the engineering complexity behind these bespoke components.

Our thanks to everyone at Amurrio — from the management team to the workshop floor — for their warm hospitality and for sharing the story of a company where technical excellence and social commitment go hand in hand.

Cookie Policy
See your Privacy Settings to learn more.
Home