Improvement of the transverse permeability of the VT‑010 railway infrastructure on Metrovalencia Line 3. Removal of the ME‑4 level crossing on the CV‑300 road, in Meliana (Valencia).

18 month

EXECUTION PERIOD

€9,562,465.72

TOTAL INVESTMENT OF THE WORKS (VAT INCLUDED)

PROJECT

The Meliana level crossing is a documented safety risk — trams, road traffic and pedestrians converging at a single point. Its elimination is a priority for FGV and the Valencian Railway Safety Agency (ASFV), audited by the Directorate‑General for Public Works, Transport and Sustainable Mobility of the Generalitat Valenciana.

The project eliminates the conflict while maintaining full tram operability — pedestrians, cyclists and vehicles each with their own safe, uninterrupted path.

Better accessibility for everyone — pedestrians, cyclists, drivers. Aligned with SDG 10 and SDG 11.