Road Infrastructure Reconstruction
in Gestalgar (Valencia)
EXECUTION PERIOD
TOTAL INVESTMENT (VAT INCLUDED)
BACKGROUND
On 29 October 2024, an Isolated High‑Level Depression (DANA) caused severe damage to several road infrastructures in the municipality of Gestalgar, particularly in areas close to the Turia River.
The affected infrastructures, which are municipally owned, are essential for mobility and the socio‑economic development of the area. Given the inability of local authorities to carry out the necessary works, the Valencian Regional Government (Generalitat Valenciana) authorised, through Decree‑Law 11/2024, the execution of emergency actions aimed at restoring the functionality of these infrastructures.
Description of the Works
The works carried out included the reconstruction of several damaged road sections and structures, as detailed below:
• EDAR Road / Southern Ring Road: Reconstruction of 550 metres of urban roadway, including paving works, sidewalks and public street‑lighting installations.
• EDAR Road Ford: Replacement of the destroyed crossing with a set of five prefabricated concrete box culverts, enabling crossing over the Turia River with a width of 4.50 m and a length of 14.50 m.
• Hydroelectric Power Plant Road: Repair of the Morenillo bridge over the Gabaldón ravine, reconstruction of a 235‑metre road section, and extension of the access ford to the hydroelectric power plant to a total length of 29 metres, in order to adapt it to the new riverbed conditions.
Hydroelectric Power Plant Ford
Demolished Concrete Roadway
WORKS:
- Concrete pavement
- Earthworks fills
Ford Washed Away by the DANA
WORKS:
- Prefabricated concrete box culverts, 33 units
- Riprap, bank protection
Demolished concrete Roadway
WORKS:
- Concrete paving works
Partially collapsed access road
WORKS:
- Concrete pavement construction
- Drainage ditch
- Geogrid
- Faced rockfill wall with gravel top finish
Gabaldón Bridge with severe damage to the deck and abutments
WORKS:
- Handrail replacement
Pavement damage
WORKS:
- Repaving with DTD (Thin Surface Dressing)
DEMOLISHED CONCRETE ROADWAY
WORKS:
- Concrete pavement
- Earthworks fills
FORD WASHED AWAY BY THE DANA
WORKS:
- Prefabricated concrete box culverts, 33 units
- Riprap, bank protection
PARTIALLY COLLAPSED ACCESS ROAD
WORKS:
- Concrete pavement construction
- Drainage ditch
- Geogrid
- Faced rockfill wall with gravel top finish
GABALDÓN BRIDGE WITH SEVERE DAMAGE TO THE DECK AND ABUTMENTS
WORKS:
- Handrail replacement
PAVEMENT DAMAGE
WORKS:
- Repaving with DTD (Thin Surface Dressing)
EDAR Road Ford and Southern Ring Road
Streetlight swept away by the DANA
WORKS:
- Street lighting replacement
Bicycle lane torn up from the ring road
WORKS:
- Roadway widening
Southern Ring Road devastated by the DANA
WORKS:
- Asphalt repaving
- Pothole repair
- Street lighting
- Utility chambers
Ford swept away by the DANA
WORKS:
- Replacement of the irrigation pipeline
- Rockfill protection for riverbanks
- Prefabricated concrete box culverts, 15 units
- Construction of a concrete road base
Agricultural road severely damaged
WORKS:
- Granular subbase construction
STREETLIGHT SWEPT AWAY BY THE DANA
WORKSW:
- Street lighting replacement
BICYCLE LANE TORN UP FROM THE RING ROAD
WORKS:
- Roadway widening
SOUTHERN RING ROAD DEVASTATED BY THE DANA
WORKS
WORKS:
- Asphalt repaving
- Pothole repair
- Street lighting
- Utility chambers
FORD SWEPT AWAY BY THE DANA
WORKS:
- Replacement of the irrigation pipeline
- Rockfill protection for riverbanks
- Prefabricated concrete box culverts, 15 units
- Construction of a concrete road base
AGRICULTURAL ROAD SEVERELY DAMAGED
WORKS:
- Granular subbase construction